Oil & Gas

Remote mines, drilling rigs and oilfield camps run on diesel as prime power, not standby. Cunmi builds heavy-duty, dust-tolerant packages with oversize cooling and dual fuel filtration.

The Challenge

Oil & Gas power requirements

In a mine, the generator is the grid. That means prime-power ratings, continuous duty at high ambient temperature, and a service philosophy built around planned shutdowns rather than unplanned failures.

Our mining packages use marine-derived engine platforms with high torque rise for crusher and mill starting loads, plus a 100 % oversize radiator and two-stage fuel filtration for sites running on heavy or contaminated fuel.

Oil & Gas 行业场景图 / Oil & Gas application photo
Recommended Products

Ratings we specify most often for Oil & Gas

Each rating below is a published row from the brand model tables. Open Size range for the full span, or View for the engine and alternator details.

1,000 – 2,000 kVA

CM-MB1400

Diesel generator set built around the Mitsubishi S12R-PTA-C engine, rated to ISO 8528-1.

Standby rating
1,400 kVA
Prime rating
1,250 kVA
Engine platform
S12R-PTA-C
Frequency
50 Hz
1,000 – 2,000 kVA

CM-MT1500

Diesel generator set built around the MTU 12V4000G14RF engine, rated to ISO 8528-1.

Standby rating
1,500 kVA
Prime rating
1,350 kVA
Engine platform
12V4000G14RF
Frequency
50 Hz
500 – 1,000 kVA

CM-CU825

Diesel generator set built around the Cummins KTA38G2 engine, rated to ISO 8528-1.

Standby rating
825 kVA
Prime rating
750 kVA
Engine platform
KTA38G2
Frequency
50 Hz
Solution Highlights

What makes the difference in this application

Prime-power rated

Continuous 24/7 duty at 40 – 50 °C ambient with derate documentation.

Dust and heat tolerant

Oversize radiators, cyclonic pre-cleaners and dual fuel filters.

Heavy-load starting

High torque rise for crushers, mills, conveyors and hoists.

Field service

Containerised workshops and multi-unit spare-part kits for remote camps.

How projects are delivered

From load schedule to commissioning in oil & gas

The same three stages run on every order, whatever the configuration: engineering before the quotation, a documented load test before packing, and support after the set is on site.

Engineering and sizing
Step 01

Engineering and sizing

Load schedule, starting currents, ambient and altitude derating are worked through before a rating is proposed — the alternator is sized for the largest step, not the average.

Factory build and load test
Step 02

Factory build and load test

Assembly, wiring and paint in one works, then a four-point load bank run at 25 / 50 / 75 / 100 % with the test sheet serial-numbered to the set.

Shipping, commissioning and support
Step 03

Shipping, commissioning and support

Export packing, documentation and commissioning guidance, with spare-parts supply and remote diagnosis for the life of the installation.

Related Reading

Further reading on Oil & Gas power

Technical articles and product updates relevant to this application.

Ready to buy?

Send us the load profile, site conditions and redundancy requirement. A Cunmi sales engineer will come back with a sized recommendation and budget quotation.

I'm ready to proceed

Have a technical question?

Sizing, paralleling, noise limits or grid codes — our application engineers answer specification questions before you commit to a configuration.

I have a question

Need service or spares?

Consumables, long-lead items and overhaul kits for the twenty most common platforms, held in regional hubs and quoted with honest lead times.

I have a service request