+86 151 5922 6809 sorvenmotors@gmail.com Mon – Sat, 08:30 – 18:00 (GMT+8) Get a Quote

Manufacturing

From steel rolling lines to food processing and textile mills, Cunmi supplies reliable standby and cogeneration-ready sets that keep production running through grid disturbances.

The Challenge

Manufacturing power requirements

Industrial loads are unforgiving: a voltage dip can scrap an entire batch. Our industrial packages are specified with high short-circuit capability and generous alternator margins so that motor starting does not pull the bus down.

For plants with high thermal demand, we also supply heat-recovery packages that turn exhaust waste heat into process hot water or steam, cutting total energy cost.

Manufacturing 行业场景图 / Manufacturing application photo
Recommended Products

Ratings we specify most often for Manufacturing

Each rating below is a published row from the brand model tables. Open Size range for the full span, or View for the engine and alternator details.

100 – 500 kVA

CM-CU500

Diesel generator set built around the Cummins QSZ13-G5 engine, rated to ISO 8528-1.

Standby rating
500 kVA
Prime rating
450 kVA
Engine platform
QSZ13-G5
Frequency
50 Hz
100 – 500 kVA

CM-YC413

Diesel generator set built around the Yuchai YCMJ12TAA500-G20 engine, rated to ISO 8528-1.

Standby rating
413 kVA
Prime rating
375 kVA
Engine platform
YCMJ12TAA500-G20
Frequency
50 Hz
500 – 1,000 kVA

CM-WC625

Diesel generator set built around the Weichai 6M33D572E200 engine, rated to ISO 8528-1.

Standby rating
625 kVA
Prime rating
560 kVA
Engine platform
6M33D572E200
Frequency
50 Hz
Solution Highlights

What makes the difference in this application

Motor-starting capability

Alternator sized for direct-on-line starting of large induction motors.

Parallel with grid

Import/export control, soft loading and zero-export configurations.

Heat recovery ready

Optional exhaust heat exchangers for process hot water or steam.

Power quality

Low THD alternators and optional harmonic filters for sensitive lines.

How projects are delivered

From load schedule to commissioning in manufacturing

The same three stages run on every order, whatever the configuration: engineering before the quotation, a documented load test before packing, and support after the set is on site.

Engineering and sizing
Step 01

Engineering and sizing

Load schedule, starting currents, ambient and altitude derating are worked through before a rating is proposed — the alternator is sized for the largest step, not the average.

Factory build and load test
Step 02

Factory build and load test

Assembly, wiring and paint in one works, then a four-point load bank run at 25 / 50 / 75 / 100 % with the test sheet serial-numbered to the set.

Shipping, commissioning and support
Step 03

Shipping, commissioning and support

Export packing, documentation and commissioning guidance, with spare-parts supply and remote diagnosis for the life of the installation.

Related Reading

Further reading on Manufacturing power

Technical articles and product updates relevant to this application.

Ready to buy?

Send us the load profile, site conditions and redundancy requirement. A Cunmi sales engineer will come back with a sized recommendation and budget quotation.

I'm ready to proceed

Have a technical question?

Sizing, paralleling, noise limits or grid codes — our application engineers answer specification questions before you commit to a configuration.

I have a question

Need service or spares?

Consumables, long-lead items and overhaul kits for the twenty most common platforms, held in regional hubs and quoted with honest lead times.

I have a service request