+86 151 5922 6809 sorvenmotors@gmail.com Mon – Sat, 08:30 – 18:00 (GMT+8) Get a Quote

Defense & Government

Cunmi builds customised diesel power stations for defence and government duty: modular, air-transportable and ready to run the moment they arrive on site.

The Challenge

Defense & Government power requirements

Defence power has to be self-contained. There is no grid to fall back on and no second visit if a part is missing, so the package leaves the factory complete: engine, alternator, fuel, controls, distribution and enclosure in one mobile unit.

The same platform is used for field camps, border posts, airfield ground support and civil defence installations. Units can be paralleled on site when a mission grows beyond the capacity of a single set.

Defense & Government 行业场景图 / Defense & Government application photo
Recommended Products

Ratings we specify most often for Defense & Government

Each rating below is a published row from the brand model tables. Open Size range for the full span, or View for the engine and alternator details.

1,000 – 2,000 kVA

CM-MT1250

Diesel generator set built around the MTU 18V2000G65 engine, rated to ISO 8528-1.

Standby rating
1,250 kVA
Prime rating
1,125 kVA
Engine platform
18V2000G65
Frequency
50 Hz
500 – 1,000 kVA

CM-BD825

Diesel generator set built around the Baudouin 6M31G825/5 engine, rated to ISO 8528-1.

Standby rating
825 kVA
Prime rating
750 kVA
Engine platform
6M31G825/5
Frequency
50 Hz
100 – 500 kVA

CM-FP275

Diesel generator set built around the FPT C87TE3 engine, rated to ISO 8528-1.

Standby rating
275 kVA
Prime rating
250 kVA
Engine platform
C87TE3
Frequency
50 Hz
Solution Highlights

What makes the difference in this application

Rapid deployment

Starts on arrival — no complex site assembly or commissioning work.

Modular and transportable

Compact, container-friendly frames for road, sea or air freight.

High mobility

Designed to be relocated as operations move.

Parallel-capable

Link units on site for higher power or N+1 redundancy.

How projects are delivered

From load schedule to commissioning in defense & government

The same three stages run on every order, whatever the configuration: engineering before the quotation, a documented load test before packing, and support after the set is on site.

Engineering and sizing
Step 01

Engineering and sizing

Load schedule, starting currents, ambient and altitude derating are worked through before a rating is proposed — the alternator is sized for the largest step, not the average.

Factory build and load test
Step 02

Factory build and load test

Assembly, wiring and paint in one works, then a four-point load bank run at 25 / 50 / 75 / 100 % with the test sheet serial-numbered to the set.

Shipping, commissioning and support
Step 03

Shipping, commissioning and support

Export packing, documentation and commissioning guidance, with spare-parts supply and remote diagnosis for the life of the installation.

Related Reading

Further reading on Defense & Government power

Technical articles and product updates relevant to this application.

Ready to buy?

Send us the load profile, site conditions and redundancy requirement. A Cunmi sales engineer will come back with a sized recommendation and budget quotation.

I'm ready to proceed

Have a technical question?

Sizing, paralleling, noise limits or grid codes — our application engineers answer specification questions before you commit to a configuration.

I have a question

Need service or spares?

Consumables, long-lead items and overhaul kits for the twenty most common platforms, held in regional hubs and quoted with honest lead times.

I have a service request