+86 151 5922 6809 sorvenmotors@gmail.com Mon – Sat, 08:30 – 18:00 (GMT+8) Get a Quote

Data Centers

Data centres cannot tolerate a single second of downtime. Cunmi supplies containerised and indoor generator sets engineered for N+1 and 2N topology, with fast load acceptance and full paralleling control.

The Challenge

Data Centers power requirements

Hyperscale and colocation operators specify diesel standby power because it is the only technology that delivers full rated load within 10 seconds and sustains it indefinitely. Our data-centre packages are designed around that requirement: generous alternator sizing, class G3 load acceptance and redundancy at every level.

Each Cunmi data-centre project starts with a load profile study. We then model step-load response, transient deviation and harmonic content so that the specified set matches the UPS and chiller starting currents on site — not just the nameplate figure.

Data Centers 行业场景图 / Data Centers application photo
Recommended Products

Ratings we specify most often for Data Centers

Each rating below is a published row from the brand model tables. Open Size range for the full span, or View for the engine and alternator details.

1,000 – 2,000 kVA

CM-MT2000C

Diesel generator set built around the MTU 12V4000G63 engine, rated to ISO 8528-1.

Standby rating
2,000 kVA
Prime rating
1,812 kVA
Engine platform
12V4000G63
Frequency
50 Hz
1,000 – 2,000 kVA

CM-MB1915

Diesel generator set built around the Mitsubishi S16R-PTA-C engine, rated to ISO 8528-1.

Standby rating
1,915 kVA
Prime rating
1,750 kVA
Engine platform
S16R-PTA-C
Frequency
50 Hz
1,000 – 2,000 kVA

CM-BD1650

Diesel generator set built around the Baudouin 12M33G1650/5 engine, rated to ISO 8528-1.

Standby rating
1,650 kVA
Prime rating
1,500 kVA
Engine platform
12M33G1650/5
Frequency
50 Hz
Solution Highlights

What makes the difference in this application

Class G3 load acceptance

Accepts 70 % of rated load in a single step and recovers within ISO 8528 limits.

N+1 and 2N topology

Parallel-capable controllers with automatic synchronising, load sharing and bus-tie logic.

Continuous monitoring

Remote SCADA integration via Modbus TCP, SNMP or BACnet to your BMS.

Rapid deployment

Containerised packages arrive factory-tested and ready for cable termination.

How projects are delivered

From load schedule to commissioning in data centers

The same three stages run on every order, whatever the configuration: engineering before the quotation, a documented load test before packing, and support after the set is on site.

Engineering and sizing
Step 01

Engineering and sizing

Load schedule, starting currents, ambient and altitude derating are worked through before a rating is proposed — the alternator is sized for the largest step, not the average.

Factory build and load test
Step 02

Factory build and load test

Assembly, wiring and paint in one works, then a four-point load bank run at 25 / 50 / 75 / 100 % with the test sheet serial-numbered to the set.

Shipping, commissioning and support
Step 03

Shipping, commissioning and support

Export packing, documentation and commissioning guidance, with spare-parts supply and remote diagnosis for the life of the installation.

Related Reading

Further reading on Data Centers power

Technical articles and product updates relevant to this application.

Ready to buy?

Send us the load profile, site conditions and redundancy requirement. A Cunmi sales engineer will come back with a sized recommendation and budget quotation.

I'm ready to proceed

Have a technical question?

Sizing, paralleling, noise limits or grid codes — our application engineers answer specification questions before you commit to a configuration.

I have a question

Need service or spares?

Consumables, long-lead items and overhaul kits for the twenty most common platforms, held in regional hubs and quoted with honest lead times.

I have a service request