+86 151 5922 6809 sorvenmotors@gmail.com Mon – Sat, 08:30 – 18:00 (GMT+8) Get a Quote

Healthcare

Operating theatres, intensive care units, blood banks and imaging suites all need power that never blinks. Cunmi supplies silent and containerised sets qualified for hospital duty, including WHO-standard vaccine cold-chain installations.

The Challenge

Healthcare power requirements

A hospital standby system has to do more than start. It must transfer within the limits defined by IEC 60364-7-710 for medical locations, keep voltage deviation inside ±10 %, and stay quiet enough for a ward to sleep next to it.

We work with MEP consultants and biomedical engineers from the design stage, providing load calculations, single-line diagrams and acoustic reports for the tender package.

Healthcare 行业场景图 / Healthcare application photo
Recommended Products

Ratings we specify most often for Healthcare

Each rating below is a published row from the brand model tables. Open Size range for the full span, or View for the engine and alternator details.

100 – 500 kVA

CM-CU385

Diesel generator set built around the Cummins NTA855-G4 engine, rated to ISO 8528-1.

Standby rating
385 kVA
Prime rating
350 kVA
Engine platform
NTA855-G4
Frequency
50 Hz
100 – 500 kVA

CM-PK330

Diesel generator set built around the Perkins 1506A-E88TAG5 engine, rated to ISO 8528-1.

Standby rating
330 kVA
Prime rating
300 kVA
Engine platform
1506A-E88TAG5
Frequency
50 Hz
100 – 500 kVA

CM-BD500

Diesel generator set built around the Baudouin 6M21G500/5 engine, rated to ISO 8528-1.

Standby rating
500 kVA
Prime rating
450 kVA
Engine platform
6M21G500/5
Frequency
50 Hz
Solution Highlights

What makes the difference in this application

Medical-grade changeover

Automatic transfer switches designed for theatre and ICU circuits.

Low noise, low vibration

Super-silent canopies and resilient-mounted exhaust for ward-adjacent sites.

Cold-chain qualified

2 – 30 kVA packages for vaccine and blood-bank refrigeration, WHO compliant.

Tested documentation

Factory test certificates, witness testing and O&M manuals supplied.

How projects are delivered

From load schedule to commissioning in healthcare

The same three stages run on every order, whatever the configuration: engineering before the quotation, a documented load test before packing, and support after the set is on site.

Engineering and sizing
Step 01

Engineering and sizing

Load schedule, starting currents, ambient and altitude derating are worked through before a rating is proposed — the alternator is sized for the largest step, not the average.

Factory build and load test
Step 02

Factory build and load test

Assembly, wiring and paint in one works, then a four-point load bank run at 25 / 50 / 75 / 100 % with the test sheet serial-numbered to the set.

Shipping, commissioning and support
Step 03

Shipping, commissioning and support

Export packing, documentation and commissioning guidance, with spare-parts supply and remote diagnosis for the life of the installation.

Related Reading

Further reading on Healthcare power

Technical articles and product updates relevant to this application.

Ready to buy?

Send us the load profile, site conditions and redundancy requirement. A Cunmi sales engineer will come back with a sized recommendation and budget quotation.

I'm ready to proceed

Have a technical question?

Sizing, paralleling, noise limits or grid codes — our application engineers answer specification questions before you commit to a configuration.

I have a question

Need service or spares?

Consumables, long-lead items and overhaul kits for the twenty most common platforms, held in regional hubs and quoted with honest lead times.

I have a service request